CHINA NATIONAL TECHNICAL IMP.&EXP.CORP.

  • HOME
  • ABOUT CNTIC
    • Brief Introduction
    • Message from General Manager
    • Top Management Team
    • Organization Chart
    • Trademark & Certificate
    • History
  • BUSINESS
    • Power & Energy
    • Infrastructures
    • Industrial Engineering
    • Energy Conservation and Environment Protection
  • NEWS CENTER
    • Picture News
    • News
    • Information
    • Video
  • GLOBAL NETWORKS
  • CORE COMPETANCE
    • Core Competance
  • CONTACT US
    • Contact us
    • Site map
  • Picture News
  • News
  • Information
  • Video
HOME>NEWS CENTER>Picture News
 Overseas Attractions: Commencement Ceremony of Training Class Held in China for The Owner from CNTIC Bangladesh Ghorasal Power Station Project
Overseas Attr...
 Overseas Attractions: Hoisting Work of Exhaust Heat Boiler Steel Frame started in CNTIC Bangladesh Ghorasal Power Station Project
Overseas Attr...
Vice President of CNTIC Jiang Junhua Participated in Trade and Economic Cooperation Forum of China-Philippines
Vice President...
The Third Detailed Design Review Meeting of CNTIC Bangladesh Ghorasal Power Station Project Was Held Successfully
The Third Deta...
Overseas Attractions: Jambi Gas Turbine Power Station in South Sumatra, Indonesia Contracted by CNTIC Passed the 72-Hour Reliability Test in Only One Shot
Overseas Attra...
 Mr.Zhang Xu,vice president of CNTIC, went to Adipala1 power plant project in Indonesia to guide the work of performance test.
Mr.Zhang Xu,v...
CNTIC Carried out Fire Safety Drill of 2016
CNTIC Carried ...
CNTIC Organized Overseas Counterterrorism Training
CNTIC Organize...
The Gas Turbine of Ghorasal 300-450MW CCPP Project Was Placed to the Designated Position Successfully
The Gas Turbin...
Overseas attraction: The First Draining Test of Water Treatment Plant Built by CNTIC Successed in Chittagong,Bangladesh.
Overseas attra...
Vice President of CNTIC Zhang Xu Visited DongFang Turbine Co.,Ltd and DongFang Electric Machinery Co., Ltd
Vice President...
The Gas Turbine Transformer of Ghorasal 300-450MW CCPP Project that Purchased from Siemens Was Placed to the Designated Position Successfully
The Gas Turbin...
212223242526272829302966783
Site map  |  Contact Us
Copyright 2004 CNTIC China National Technical IMP & EXP Corp
The preparation of ICP 18047782 | Beijing public security for the record number110401300008
Links: